Project CLIP Directrices Merged 20Jan2011 FR_Groupe 5_revisions4Feb2011
![](/sites/default/files/2021-10/Project%20CLIP%20Directrices%20Merged%2020Jan2011%20FR_Groupe%205_revisions4Feb2011%20.pdf.jpg)
Group 5 continued to work on their submission in the week following the workshop and provided a revised version on 4 February 2011.
Download the resource
Format: application/pdf
Size: (0.41 MB)
Size: (0.41 MB)